MSUN Home EventsbulletCalendarbulletA-Z IndexbulletDirectoriesbulletContact Us  
Northern's 75th Anniversary Logo  
  About MSU-Northern bullet Academics bullet Admissions bullet Campus Life bullet Services  
     

MSU-N History
University System
Timeline
Leadership
Buildings
Acknowledgments

The 2004-2005 75th Anniversary Celebration

Images of MSUN

About MSU-Northern

History

Student Union Buildings

By 1947 the student body had outgrown the meeting room in East Hall SUB, 1947and the need for a student center was evident. Negotiations began for the purchase of a recreation building from the Moutt Mine near Columbus. This one story 110 x 60 foot building was cut into sections and moved to the NMC campus late in 1947. It was delayed in opening for use because of lack of funds for repairs. These eventually brought the cost of the building to $4,127.24. The SUB, as it was called, had both a large and a small lounge, a cafeteria, store, and offices and several smaller rooms. Never in top shape and lacking money for extensive remodeling, the building was patched and painted enough to make it acceptable for use by the fall of 1948. It remained in use until plans for the new Student Union Building at the same site caused the building to be moved to the southern edge of the campus and converted into a construction technology shop. By 1979 the building, shorn of its decorative porches, was used only for storage. It was demolished in the mid 1980s to make way for additional parking and what would become the new Farm Mechanics Building.
 

East Hall
Pershing Hall
Donaldson Hall
Men's Co-Op
Industrial Arts
Vets Housing
Student Union
Cowan Hall
Physical Plant
Automotive
Gymnasium
Campus Houses
Morgan Hall
Food Service
Married Student Housing
Math/Science
Electronics
Engineering Tech
MacKenzie Hall
Library
Farm Mechanics
Applied Technology

Almost 20 years had elapsed and the college had on its campus five buildings that had cost the state little or nothing. Enrollment was growing rapidly and notice had been given of the discontinuation of the lease on the space at the high school. It seemed time to request state funds for the construction of an administration and main classroom building, but troubles were already in the offing.

By 1958 plans were being drawn for a new Student Union Building on the campus. The entire cost of the structure was to be borne by students and financed by increased fees authorized by the students themselves. Max Kuhr of Havre was appointed the architect for the building. Built in almost the same location as the original Student Union Building, it was ready for use in 1961.

Architectural plans indicated that a chapel could be added to the north of the SUB and connected to it. Though the plan was discussed several times, no action was taken.

The new building has a large ballroom and a smaller adjoining open space, an attractive fireside room and lounge, bookstore space and new offices and a snack bar. A smaller second floor houses conference rooms and additional office space. A large basement allowed room for the development of recreational facilities. These were added in 1964. A pin-and-cue area was added in 1965.
 

 
©